We were called to an old leaking concrete pond but once emptied and cleaned it was clear that the concrete was beyond repair and the customer chose a fibreglass option as the solution but it is Autumn 2020 and the weather is turning so we constructed a temporary shelter to work under.
The concrete was decades old and cracked and crumbling all over.
After cleaning the pond we needed to make the pond surface smooth and dry to allow fibreglassing. Once this preparation was completed we left the pond covered for over a week to dry, protected from the autumn rain and gales coming with too much frequency to make life easy.
Various views after completion
Needless to say our customer was very happy with the end result